Referring to Coast Guard Regulations (46 CFR), the emergency bilge system __________.

  1. Ahas no independent primary pump
  2. Bis independent of the main bilge system ✓
  3. Chas a cross connection to the ballast system
  4. Dis part of the independent bilge system

Correct answer: B) is independent of the main bilge system