SeaQuiz

Watertight hatches are closed

  1. Aevery day at the end of the loading and unloading work.
  2. Bwhen there is an extreme storm warning.
  3. Cduring the preparation of the ship for sailing and on alert. ✓
  4. Donly by order of the Master.

Correct answer: C) during the preparation of the ship for sailing and on alert.

This question also appears in: F3 Controlling the Operation — Management Level

← PreviousNext →
Take the full test: F3 Controlling the Operation — Operational Level (OOW) →Random exam test generator, free, no registration

More questions from this test

Question list: F3 Controlling the Operation — Operational Level (OOW)