SeaQuiz

In a river port the limiting load line is defined by the Convention on Load Lines 1966 LL, having regard to:

  1. Athe conditions of the zones and seasons for the mouth of the river.
  2. Bthe conditions of the zones and seasons for the mouth of the River, but is allowed to increase the draught for density of the water < 1.025 t/m3.
  3. Cthe conditions of the zones and seasons for the mouth of the River, but it is allowed to increase the draught for density of the water < 1.025 t/m3 and for the consumption for the passage to the mouth. ✓
  4. Dinternational regulations for River load lines.

Correct answer: C) the conditions of the zones and seasons for the mouth of the River, but it is allowed to increase the draught for density of the water < 1.025 t/m3 and for the consumption for the passage to the mouth.

← PreviousNext →
Take the full test: F3 Controlling the Operation — Management Level →Random exam test generator, free, no registration

More questions from this test

Question list: F3 Controlling the Operation — Management Level