Where should be the requirements of SOLAS, ch. II-1 "Damage Control Plan" and who should meet him?
- ANeed to be exposed on the bridge and in the machinery space to be accessible to all members of the crew.
- BThere should be a manual containing the information to combat flooding accessible to the Master and Chief Engineer.
- CNeed to be exposed or easily accessible on the bridge, as well as to have a guide containing the information of the plan available to all officers. ✓
- DNeed to be exposed to the bridge and accessible to the Master and deck officers.
Correct answer: C) Need to be exposed or easily accessible on the bridge, as well as to have a guide containing the information of the plan available to all officers.