The introduction of an additional loop in the steam boiler is done in order to:

  1. AImprove gas exchange processes.
  2. BTo reduce the influence of water quality on the boiler operation. ✓
  3. CImprove the circulation of water in the boiler.
  4. DImprove the combustion processes.

Correct answer: B) To reduce the influence of water quality on the boiler operation.