SeaQuiz

The introduction of an additional circuit in the steam boiler is done in order to:

  1. ATo improve gas exchange processes.
  2. BTo reduce the influence of water quality on the operation of the boiler. ✓
  3. CTo improve water circulation in the boiler.
  4. DTo improve combustion processes.

Correct answer: B) To reduce the influence of water quality on the operation of the boiler.

← PreviousNext →
Take the full test: F4 Marine Engineering — Management Level →Random exam test generator, free, no registration

More questions from this test

Question list: F4 Marine Engineering — Management Level