Which of the listed power plants requires the shortest time to safe loading from starting modes to nominal load mode?

  1. AThe diesel power plant.
  2. BThe steam turbine power plant.
  3. CThe gas turbine power plant. ✓
  4. DThe combined power system CODAG.

Correct answer: C) The gas turbine power plant.