At 1300, 5 January, the river will be temporarily closed to navigation for six hours at mile 531.3 AHP due to repairs to a bridge. What minimum speed over the ground must you make from Natchez Gage in order not to be delayed?
- A5.7 mph
- B6.0 mph ✓
- C6.8 mph
- D7.3 mph
Correct answer: B) 6.0 mph