The draw of the Burlington Northern railroad bridge across the Columbia River at mile 328.0 shall be opened on signal, without prior notice, from __________.
- A6:00 am to 6:00 pm
- B6:00 pm to 6:00 am
- C8:00 pm to 4:00 am
- D8:00 am to 4:00 pm ✓
Correct answer: D) 8:00 am to 4:00 pm