The river will be temporarily closed to navigation at mile 531.3 AHP due to repairs to the bridge. This will occur at 1530, 5 January, and last for six hours. What minimum speed over the ground must you make from Red River Landing Gage in order not to be delayed?
- A6.2 mph ✓
- B6.4 mph
- C6.8 mph
- D7.3 mph
Correct answer: A) 6.2 mph