SeaQuiz

The shear rams of a MODU blowout preventer stack are used in emergency well control to __________.

  1. Aclose and seal around the drill pipe
  2. Bclose and seal around casing
  3. Ccut off pipe inside the preventer stack ✓
  4. Dclose and seal around drill collars

Correct answer: C) cut off pipe inside the preventer stack

USCG question bank (2008) · Deck Safety – Question Bank Book 4 · pass mark 70%

← PreviousNext →
Take the full practice test: Deck Safety – Question Bank Book 4 →Free USCG practice test with the real pass mark, no sign-up

More questions from this module

Question list: Deck Safety – Question Bank Book 4 (BK4)