The DEEP DRILLER is loaded as shown in Sample Load Form #4. While the unit is deballasting, port valve 5 fails in the closed position. You may deballast from tank 2P by pumping from tank 9P by also opening valves 6 and __________.
- A35
- B21
- C20 ✓
- D8
Correct answer: C) 20