The DEEP DRILLER is loaded as shown in Sample Load Form #4 (Drilling). While the unit is deballasting, starboard valve 19 fails in the closed position. You may deballast from tank 9S by pumping from tank 8S by opening valves 20 and __________.

  1. A35
  2. B21
  3. C18 ✓
  4. D17

Correct answer: C) 18

USCG question bank (2008) · Deck Safety – Question Bank Book 4 · pass mark 70%