Using high working tensions in the mooring system reduces the __________.

  1. Ahook load at drilling depths over 10,000 feet
  2. Bpossibility of dragging anchors
  3. Callowable deck load at operating draft
  4. Dmargin between working tension and breaking strength ✓

Correct answer: D) margin between working tension and breaking strength

USCG question bank (2008) · Deck Safety – Question Bank Book 4 · pass mark 70%