A vessel in ocean service that does not have an approved means of processing oily bilge slops or oily ballast must have __________.

  1. Aa fixed piping system for ballast discharge to a reception facility ✓
  2. Ba discharge outlet for the ballast system on each side of the weather deck
  3. Cone portable adapter for a shore connection to the ballast line
  4. DAll of the above

Correct answer: A) a fixed piping system for ballast discharge to a reception facility

USCG question bank (2008) · Deck Safety – Question Bank Book 4 · pass mark 70%