A vessel's tropical load line is 6 in. above her summer load line. Her TPI is 127 tons. She will arrive in the summer zone 8 days after departure. She will burn off about 47 tons/day fuel and water consumption is 12 tons/day. How many tons may she load above her summer load line if she loads in the tropical zone?

  1. A376
  2. B472 ✓
  3. C762
  4. D1016

Correct answer: B) 472