SeaQuiz

Towing vessel fire protection regulations require that all fuel tank vent pipes comply with all of the following provisions EXCEPT that the vent __________.

  1. Aconnects to the highest point of the tank
  2. Bsystem discharges on a weather deck through a U-shaped 180 degree pipe bend
  3. Cbe fitted with a 30-by-30 corrosion resistant flame screen
  4. Dmust have a positive-acting shut-off valve to prevent water from entering the tank in heavy weather ✓

Correct answer: D) must have a positive-acting shut-off valve to prevent water from entering the tank in heavy weather

USCG question bank (2008) · Deck Safety – Question Bank Book 4 · pass mark 70%