The DEEP DRILLER is loaded as shown in Sample Load Form #4 (Drilling). What would be the new sum of transverse moments for Fuel Oil if the entire contents of Tank 4P are transferred to Tank 4S?

  1. A995 foot-tons
  2. B16,918 foot-tons
  3. C17,713 foot-tons
  4. D34,381 foot-tons ✓

Correct answer: D) 34,381 foot-tons

USCG question bank (2008) · Deck Safety – Question Bank Book 4 · pass mark 70%