On the DEEP DRILLER, to pump bilge water out of the starboard pump room using both bilge pumps, it is necessary to open valves __________.
- A41 and 42
- B39 and 40
- C39, 40, 41, and 42 ✓
- D39, 40, 41, 42, 26, and 28
Correct answer: C) 39, 40, 41, and 42
Correct answer: C) 39, 40, 41, and 42