What are the vertical moments for the cement contents of P-tank #1 of the DEEP DRILLER if the ullage is 2.3 feet? A4,198 ft-tonsB7,067 ft-tons ✓C7,096 ft-tonsD14,921 ft-tons Correct answer: B) 7,067 ft-tons USCG question bank (2008) · Deck Safety – Question Bank Book 4 · pass mark 70%