Before deballasting to survival draft in the event of predicted heavy weather, the DEEP DRILLER Operations Manual recommends that the mooring lines be slacked __________.

  1. A10 feet
  2. B20 feet ✓
  3. C30 feet
  4. D40 feet

Correct answer: B) 20 feet

USCG question bank (2008) · Deck Safety – Question Bank Book 4 · pass mark 70%