Before deballasting to survival draft in the event of predicted heavy weather, the DEEP DRILLER Operations Manual recommends that the mooring lines be slacked __________.
- A10 feet
- B20 feet ✓
- C30 feet
- D40 feet
Correct answer: B) 20 feet
Correct answer: B) 20 feet