The final inspection responsibility for seeing that a tank barge is provided with the required equipment and fittings in good and serviceable condition prior to loading cargo rests with the __________.
- Aterminal operator
- Bowner of the barge
- Ctankerman or person in charge of loading ✓
- Dcharterer through the Master of the towing vessel
Correct answer: C) tankerman or person in charge of loading