When hoisting personnel from a vessel, with the MODU cranes, the crane operator must assure that __________.
- Athe personnel carrier remains directly over the vessel
- Ball personnel are inside the net type carrier
- Cthe personnel carrier remains directly over water ✓
- Dhe does not swing the load until it is above the landing area
Correct answer: C) the personnel carrier remains directly over water