The last 1.0 meter (3.3 feet) of vapor piping before the vessel vapor connection must be painted __________.
- Ared/yellow/red ✓
- Byellow/red/yellow
- Cinternational orange
- Dhi-visibility yellow
Correct answer: A) red/yellow/red
Correct answer: A) red/yellow/red