The last 1.0 meter (3.3 feet) of vapor piping before the vessel vapor connection must be painted __________.

  1. Ared/yellow/red ✓
  2. Byellow/red/yellow
  3. Cinternational orange
  4. Dhi-visibility yellow

Correct answer: A) red/yellow/red

USCG question bank (2008) · Deck Safety – Question Bank Book 4 · pass mark 70%