SeaQuiz

Why should you preload a mooring system above your precalculated operating mooring tensions?

  1. AThis serves as a benchmark for increasing tensions in rough weather. ✓
  2. BThis allows you to determine existing bottom conditions.
  3. CThis insures that the anchor cable is stretched out in a straight line.
  4. DThis tests all the components of your mooring equipment.

Correct answer: A) This serves as a benchmark for increasing tensions in rough weather.

USCG question bank (2008) · Deck Safety – Question Bank Book 4 · pass mark 70%

← PreviousNext →