How are riveted lap joints made watertight?
- AThe faying surfaces are coated with white lead (or similar product) before the rivets are set.
- BA sealing weld bead of 1/8" or less pitch is run along the plate edge.
- CThe plate edge is split close to an adjacent plate and mechanically forced into contact with the adjacent plate. ✓
- DA properly riveted joint will be watertight; any leakage is stopped by setting up on the rivets.
Correct answer: C) The plate edge is split close to an adjacent plate and mechanically forced into contact with the adjacent plate.