SeaQuiz

Which immediate action should the operator of a pedestal crane take if crane control is lost?

  1. ALet go of both control levers and return to neutral position. ✓
  2. BCall the engine room.
  3. CDisconnect the power to the pedestal.
  4. DCall the electrician.

Correct answer: A) Let go of both control levers and return to neutral position.

USCG question bank (2008) · Deck General – Question Bank Book 2 · pass mark 70%