Which of the following actions are stated in the correct order prior to loading or discharging cargo on a Ro-Ro vessel?
- ATurn on ventilation for cargo holds, lower the stern ramp, raise/open the stern door
- BTurn on ventilation for cargo holds, raise/open the stern door, lower the stern ramp
- CLower the stern ramp, raise/open the stern door, turn on ventilation for cargo holds ✓
- DRaise/open the stern door, lower the stern ramp, turn on ventilation for cargo holds
Correct answer: C) Lower the stern ramp, raise/open the stern door, turn on ventilation for cargo holds