While discharging a cargo, the stripping of the tanks falls behind schedule. This would indicate the __________.

  1. Amain pumps are working at a high discharge pressure
  2. Bmain pumps are leaving too much oil in the tanks ✓
  3. Cstripping pump is not primed
  4. Dstripping line is cross-connected to the main line

Correct answer: B) main pumps are leaving too much oil in the tanks

USCG question bank (2008) · Deck General – Question Bank Book 2 · pass mark 70%