SeaQuiz

The signal man assisting the crane operator has his arm extended, with the thumb pointing up, and is flexing his fingers in and out for as long as the load movement is desired. This is the signal to __________.

  1. Alower the boom and raise the load
  2. Braise the boom and lower the load ✓
  3. Clower the boom and lower the load
  4. Draise the boom and raise the load

Correct answer: B) raise the boom and lower the load

USCG question bank (2008) · Deck General – Question Bank Book 2 · pass mark 70%

← PreviousNext →
Take the full practice test: Deck General – Question Bank Book 2 →Free USCG practice test with the real pass mark, no sign-up

More questions from this module

Question list: Deck General – Question Bank Book 2 (BK2)