During severe storms, when survival becomes a major concern, it may become necessary to relieve high anchor tensions on the windward side of the MODU by __________.

  1. Adeballasting the rig
  2. Bballasting the rig
  3. Cpaying out cable on the windward side
  4. Dpaying out cable on the leeward side ✓

Correct answer: D) paying out cable on the leeward side

USCG question bank (2008) · Engineering Safety – Question Bank Book 15 · pass mark 70%