When bunkering operations are completed, the hoses should be __________.

  1. Adrained into drip pans or tanks ✓
  2. Bblown down with nitrogen or inert gas
  3. Csteam cleaned and flushed with hot water
  4. Dstowed with their ends open for venting

Correct answer: A) drained into drip pans or tanks