Pollution Prevention Regulations (33 CFR) specify that the person-in-charge of bunkering is responsible for the __________.
- Avessel draft
- Bquantity of fuel received
- Cquality of fuel received
- Dcommunications with terminal operator ✓
Correct answer: D) communications with terminal operator