While on watch in the engine room, you hear a continuous sounding of the general alarm. Which of the following actions should you take FIRST?

  1. ASecure the burners then proceed to your assigned boat station.
  2. BStart the fire pump and establish flow to the fire main. ✓
  3. COpen the guardian valve and standby to maneuver.
  4. DOpen the master control valves on the fixed CO2 system.

Correct answer: B) Start the fire pump and establish flow to the fire main.

USCG question bank (2008) · Engineering Safety – Question Bank Book 15 · pass mark 70%