An ocean going ship of 4000 gross tons must be fitted with a standard discharge shore connection for the discharge of oily wastes to a reception facility. The dimensions for the connection are specified in the Pollution Prevention Regulations under Part
- A151
- B153
- C154
- D155 ✓
Correct answer: D) 155