After fuel tanks have been filled and bunkers completed, which of the listed procedures should be followed next?

  1. AThe pressure-vacuum relief valve should be reset.
  2. BThe tanks should be made seaworthy to prevent contamination.
  3. CThe tanks should be sounded to verify levels. ✓
  4. DThe tanks should be marked with a bull stamp on the manifold filling valve.

Correct answer: C) The tanks should be sounded to verify levels.

USCG question bank (2008) · Engineering Safety – Question Bank Book 15 · pass mark 70%