After an emergency shoring installation has been completed, the __________.

  1. Arepair is completed and no further action is needed
  2. Btimbers are nailed in place to prevent looseness
  3. Cshoring should be frequently inspected for looseness ✓
  4. Ddamaged plating should be straightened by heating

Correct answer: C) shoring should be frequently inspected for looseness

USCG question bank (2008) · Engineering Safety – Question Bank Book 15 · pass mark 70%