"Line Displacement" is a procedure that is followed at an oil terminal facility, when there is a change of __________.

  1. Acargo lines at the terminal before loading
  2. Bproduct before the start of loading
  3. Cproduct during the final phase of loading ✓
  4. Dproduct after the final discharge

Correct answer: C) product during the final phase of loading

USCG question bank (2008) · Engineering Safety – Question Bank Book 15 · pass mark 70%