When you have completed bunkering operations, the hoses should be __________.

  1. Ablown down with inert gas
  2. Bdrained into drip pans or tanks ✓
  3. Cstowed with their ends open for venting
  4. Dsteam cleaned and flushed with hot water

Correct answer: B) drained into drip pans or tanks

USCG question bank (2008) · Engineering Safety – Question Bank Book 15 · pass mark 70%