When securing the operation of an inert gas system, the final step should be _________.

  1. Aclose the deck isolating valve
  2. Bclose the flue gas isolating valve
  3. Csecure the inert gas blower
  4. Dsecure the salt water supply to the scrubber ✓

Correct answer: D) secure the salt water supply to the scrubber

USCG question bank (2008) · Engineering Safety – Question Bank Book 15 · pass mark 70%