SeaQuiz

Which of the following methods will reduce the possibility of producing an electrical spark?

  1. AUsing a cargo hose with a built in electrical bonding wire.
  2. BConnecting a bonding wire between the shore side piping and the vessel.
  3. CPlacing an insulating flange or a section of non-conducting hose in the hose setup.
  4. DAll of the above. ✓

Correct answer: D) All of the above.

USCG question bank (2008) · Engineering Safety – Question Bank Book 15 · pass mark 70%