SeaQuiz

The oil transfer procedures required onboard vessels with a capacity of 250 or more barrels (39.7 cubic meters or more) of oil must contain __________.

  1. Aa line diagram of the vessel's oil transfer piping ✓
  2. Bprocedures for fighting oil fires
  3. Cprocedures for cleaning up oil spills
  4. DAll of the above

Correct answer: A) a line diagram of the vessel's oil transfer piping

USCG question bank (2008) · Engineering Safety – Question Bank Book 15 · pass mark 70%

← PreviousNext →
Take the full practice test: Engineering Safety – Question Bank Book 15 →Free USCG practice test with the real pass mark, no sign-up

More questions from this module

Question list: Engineering Safety – Question Bank Book 15 (BK15)