If it becomes necessary to pump bilges while a vessel is in port, which of the following procedures should be followed?

  1. APump only if the discharge is led to a shore tank or barge. ✓
  2. BPump only during the hours of darkness.
  3. CPump only on the outgoing tide.
  4. DPump only as much as is necessary.

Correct answer: A) Pump only if the discharge is led to a shore tank or barge.