If the engineer on watch has reason to doubt the accuracy of the water level showing in the boiler gage glass, he should FIRST __________.

  1. Aopen the auxiliary feed line
  2. Bblow down the gage glass ✓
  3. Creplace the gage glass
  4. Dstart the standby feed pump

Correct answer: B) blow down the gage glass

USCG question bank (2008) · Steam Plants – Question Bank Book 13 · pass mark 70%