The vent line from the main condenser water boxes was not opened when the waterside was recharged. This would __________.
I. lead to a build up of pressure on the tube sheet of greater than 40 psig.
II. prevent the design vacuum from being attained under normal operating conditions at sea.

  1. AI only
  2. BII only ✓
  3. CBoth I and II
  4. DNeither I nor II

Correct answer: B) II only

USCG question bank (2008) · Steam Plants – Question Bank Book 13 · pass mark 70%