If a ship is to be laid up for an indefinite period, the steam side of the main condenser should be __________.

  1. Afilled with moist air
  2. Bleft under a vacuum
  3. Ccompletely drained of water ✓
  4. Dpressurized to approximately 5 psig with nitrogen, 99.5% pure by volume

Correct answer: C) completely drained of water

USCG question bank (2008) · Steam Plants – Question Bank Book 13 · pass mark 70%