A boiler has a steam delivery capacity of 100,000 pounds per hour, and is equipped with four steam atomizing burners. If the load range of the burners is 4 to 1, this means that __________.

  1. Athe boiler may be operated down to 25,000 pounds per hour without securing any burners ✓
  2. Bthe boiler may be operated down to 25,000 pounds per hour only after three burners are secured
  3. Cif two burners are operating, steam output will be a minimum of 50,000 pounds per hour
  4. Dall four burners combined can supply up to 400,000 pounds of steam per hour

Correct answer: A) the boiler may be operated down to 25,000 pounds per hour without securing any burners