In order for a maximum number of boiler generating and circulating tubes to be installed without weakening the tube sheet, which of the listed procedures should be carried out?
- AAll rows of tubes should be bent at the same angle.
- BAll rows of tubes should be installed horizontal to the drum.
- CDifferent rows of tubes should be bent to enter the drum at any convenient angle.
- DAll tubes should be installed normal to the drum surfaces. ✓
Correct answer: D) All tubes should be installed normal to the drum surfaces.