After a boiler generating tube has been plugged, __________.

  1. Aa hole should be made in the defective tube ✓
  2. Bthe firing rate should be reduced
  3. Cthe steam flow rate must be increased
  4. Dall of the above

Correct answer: A) a hole should be made in the defective tube

USCG question bank (2008) · Steam Plants – Question Bank Book 13 · pass mark 70%