Which of the listed operating practices is considered as safe, and should be followed when opening and inspecting the waterside of a boiler?
- AOpen the water drum manhole before opening the steam drum manhole.
- BWire all valves closed that connect to other boilers. ✓
- CRemove handhole plate dogs with a slugging wrench.
- DVentilate the waterside until completely dry.
Correct answer: B) Wire all valves closed that connect to other boilers.